Revision of Design & Operation of Sewage transmission line of Khartoum Town from Souba Pump station to sewage refinery:


Clinet:

  • Khartoum State Sanitary Corporation (KSSC)/ Sudan
  • Project details:

  • Revision of the design of the pressure pipelines transfer line from the Souba Pump station to the waste water treatment plant, 700 mm in diameter by GRP type and Length of 10 km
  • Collaboration with the project contractor as a technical office to prepare shop drawings and prepare monthly statement and As-built drawings

  • Project objectives:

  • Design Checking
  • Engineering Services during Construction Period
  • Procurement of Pipe & Electro-Mechanical equipment

  • Start Date:2013
    Completion Date: 2015
    Approx. Value of Services (in Current US$): 17,269,200

     

     

     