Feasibility Studies for desalination, water supply & water transmission line from Persian Gulf to Isfahan city :
Clinet:
Isfahan Water Supply & Transmission Company
Project details:
The objective of this project is to transmit 200 MCM per year Desalted water in order to supply industrial need. Main users of this project are Mobarakeh Steel Company, Esfahan Steel Company ESCO, Isfahan Oil Refinery, Isfahan Power plant. The present studies are performed in order to carry out technical and economic evaluations of desalination and transfer of about 200 million cubic meters of water per year from the Persian Gulf to the industries of Isfahan province, taking into account other issues such as passive defense, environment and the possibility of obtaining permits and land acquisition and so on is underway to achieve the optimal option. Outlines of work in progress include: Basic studies include meteorological, hydrological, marine and terrestrial environmental, social, geological, passive defense studies Cognition studies of dewatering and desalination Water transmission line recognition studies Economic modeling and financing In this plan, while reviewing the suitable location of water withdrawal from the Persian Gulf and the approximate location of desalination facilities, the general route of transmission line routes with a length between 500 to 1000 km with a diameter of about 2200 mm is examined and the superior option is introduced using pairwise comparison method.
Project objectives:
Basic Design of Desalination Units & preparing BOT & BOO Tender Documents for the Client
Detailed Design & Basic Design for transmission system & preparing PC Tender Documents for the Client
Basic Design for supply and transmission of power
Start Date:May 2019
Completion Date: Sep 2020
Approx. Value of Services (in Current US$): 5,495,430