Water supply and water and waste management of Janja Copper Concentration Plant:
Clinet:
Janja Copper Mines and Industries Development Company
Location:
Sistan and Baluchestan Province, Nimroz County, Kariz Village
Project details:
Validation of feasibility studies
Conducting basic design studies for the additional wastewater treatment facility of Zabol Wastewater Treatment Plant with a capacity of 22,000 cubic meters per day
Preparing EPC tender documents for the additional wastewater treatment facility including: RFQ, draft contract, RFP and tender appendixes
Qualitative evaluation of bidders participating in the EPC tender for the additional wastewater treatment facility and preparing a short list
Conducting basic and detailed studies for the wastewater transfer facility from Zabol Wastewater Treatment Plant to Janja Additional Wastewater Treatment Facility including: a transmission line with a capacity of 10 million cubic meters per year made of 600 mm diameter fiberglass pipe and a length of 103 km, a pre-treatment facility and 3 pumping station sections
Preparing PC tender documents for the transmission line facility including: RFQ, draft contract, RFP and tender appendixes
Conducting aerial survey operations (UAV) of the transmission line route and pumping station sites and additional wastewater treatment facilities
Monitoring geotechnical operations of manual wells along the transmission line route and machine boreholes at the pumping station sites
Reviewing documents prepared by the client, collecting additional information, performing conceptual design and finding options for the water and waste management system
Selecting a laboratory from the list approved by the client, conducting laboratory studies and conducting tests and managing them in order to design the dewatering and waste accumulation system
Performing basic design engineering services (waste transfer, dewatering system, return water transfer and waste accumulation)
Performing detailed design engineering services (waste transfer, return water and waste accumulation)
Performing engineering services, reviewing and approving engineering documents and drawings (Design Review) prepared by EPC contractors in the waste dewatering section
Preparing tender documents and cooperating with the client and project manager in the process of selecting PC and EPC contractors
Performing consulting services for comprehensive supervision
Performing consulting services for workshop supervision and conducting workshop engineering
Performing external supervision during installation, testing and commissioning
Project objectives:
Water supply and water and waste management of Janja Copper Concentration Plant
Services: Providing consulting, design and implementation supervision services
Status: Ongoing
Start Date:
Completion Date: Ongoing
Approx. Value of Services (in Current US$): 149,617